PROJECT DEVELOPMENT - WORKPACKAGE DERIVERABLE LIST

Deliverable
No

Deliverable title

Delivery
date (*)

Nature

Dissemination
level

D1

Overview of traditional technological systems adopted for seismic rehabilitation of historical buildings in European and Mediterranean Countries

6

R

PU

D2

Assessment of earthquake-induced structural damage in historical buildings of the Mediterranean area

6

R

PU

D3

Assessment of seismic risk maps and evaluation of seismic vulnerability of historical building heritage in the Mediterranean area

6

R

PU

D4

Definition of methodologies for seismic up-grading of constructions based on both strengthening of structural elements and control of the seismic response

9

R

PU

D5

Identification of innovative materials and special devices to be used for reversible mixed technologies in structural rehabilitation

12

R

PU

D6

Development of reinforcement procedures for structural elements based on the use of reversible mixed technologies

15

R

PU

D7

Set-up of seismic protection systems based on the dissipation of seismic input energy

15

R

PU

D8

Experimental assessment of the behaviour of true-scale structural elements strengthened with innovative reversible mixed technologies

24

R

PU

D9

Calibration of numerical procedures for the analysis of strengthened structural elements on the basis of experimental results

30

R

PU

D10

Set-up of analytical models for special materials and special devices for the seismic structural control

30

R

PU

D11

Development of simplified models for the global seismic analysis of historical constructions

30

R

PU

D12

Cost-to-benefit evaluation of innovative reversible mixed technologies when used in seismic up-grading of existing constructions

30

R

PU

D13

Performance assessment of new technologies compared to traditional systems

30

R

PU

D14

Selection of study cases belonging to the historical building heritage of the Mediterranean area: analysis of feasibility of interventions based on the use of innovative reversible mixed technologies and relevant design of seismic retrofit

36

R

PU

D15

Preparation of an operational manual for the practical implementation of proposed procedures

36

R

PU

D16

Proposal of codification rules for the design of seismic protection interventions based on innovative reversible mixed technologies

36

R

PU

D1-M

Scientific coordination

0-36

-

-

D2-M

Administrative management

0-36

-

-

D3-M

Financial management

0-36

-

-


(*) Start date and end (delivery) date are referred to the beginning and to the end of indicated month, respectively. The starting date 0 (see Timetable, Table 7.4) is coincident with the beginning of the first month.